Last Modified: 11-29-2007 1.6 A
Service Category: Engine/Hybrid System Section: Emission Control
Model Year: 2008 Model: Sequoia Doc ID: RM0000030WE005X
Title: 3UR-FE EMISSION CONTROL: AIR SWITCHING VALVE: INSTALLATION (2008 Sequoia)

INSTALLATION

1. INSTALL NO. 3 AIR TUBE


(a) Install a new gasket and the No. 3 air tube with the 2 bolts.

Torque: 10 N·m (102 kgf·cm, 7 ft·lbf)

NOTICE:

Make sure that the gasket's claws are not caught between the air tube and electric air control valve assembly.

HINT:

The identification color on the flange is orange.

2. INSTALL NO. 2 AIR TUBE


(a) Install a new gasket and the No. 2 air tube with the 2 bolts.

Torque: 10 N·m (102 kgf·cm, 7 ft·lbf)

NOTICE:

Make sure that the gasket's claws are not caught between the air tube and electric air control valve assembly.

HINT:

The identification color on the flange is blue.

3. INSTALL ELECTRIC AIR CONTROL VALVE ASSEMBLY


(a) Install the electric air control valve assembly with the 3 bolts.

Torque: 21 N·m (214 kgf·cm, 16 ft·lbf)

(b) Connect the 2 electric air control valve connectors.


(c) Install the bracket with the bolt.

Torque: 8.0 N·m (82 kgf·cm, 71 in·lbf)

(d) Connect the knock sensor's connector.

4. INSTALL AIR PIPE SUB-ASSEMBLY

(a) Connect the 2 No. 1 air hoses to the air pipe.


(b) Connect the air pipe to the electric air control valve assembly, and install the air pipe with the 2 bolts.

Torque: 10 N·m (102 kgf·cm, 7 ft·lbf)


(c) Connect the air pump connector clamp holder.

(d) Attach the wire harness claw.

(e) Connect the electric air control valve connector.

(f) Connect the No. 2 air injection system hose and No. 3 air injection system hose.

5. INSTALL FRONT WATER BY-PASS JOINT


(a) Install 2 new gaskets and the front water by-pass joint with the 4 nuts.

Torque: 21 N·m (214 kgf·cm, 16 ft·lbf)

(b) Connect the engine coolant temperature sensor connector.

6. CONNECT WATER BY-PASS PIPE HOSE (w/ Trailer Towing System)


(a) Connect the water by-pass pipe hose with the 3 bolts.

Torque: 10 N·m (102 kgf·cm, 7 ft·lbf)

7. CONNECT NO. 2 WATER BY-PASS HOSE


(a) Connect the No. 2 water by-pass hose to the water by-pass joint.

8. CONNECT NO. 1 WATER BY-PASS HOSE

(a) Connect the No. 1 water by-pass hose to the water by-pass joint and water inlet housing.

9. INSTALL NO. 1 ENGINE COVER



NOTICE:

Make sure that the No. 1 engine cover is level with the top surface of the intake port of the cylinder head for 1 and 2.

(a) Install the No. 1 engine cover.

HINT:

  • Align the No. 1 engine cover cutouts with the air tube.
  • Align the No. 1 engine cover with the air switching valve surface and cylinder head wall.

10. CONNECT FUEL TUBE CLAMP


(a) Connect the fuel tube clamp to the bracket.

11. INSTALL NO. 2 CYLINDER HEAD COVER



NOTICE:

Make sure that the No. 2 cylinder head cover is level with the top surface of the intake port of the cylinder head.

(a) Install the No. 2 cylinder head cover.

HINT:

  • Align the No. 2 cylinder head cover cutout with the air tube.
  • Align the No. 2 cylinder head cover with the front water by-pass joint and cylinder head wall.

12. INSTALL FAN SHROUD (w/ Trailer Towing System) 3UR-FE COOLING: RADIATOR: INSTALLATION (2008 Sequoia)+

13. INSTALL FAN SHROUD (w/o Trailer Towing System) 3UR-FE COOLING: RADIATOR: INSTALLATION (2008 Sequoia)+

14. INSTALL OUTLET RADIATOR HOSE 3UR-FE COOLING: RADIATOR: INSTALLATION (2008 Sequoia)+

15. INSTALL INLET RADIATOR HOSE 3UR-FE COOLING: RADIATOR: INSTALLATION (2008 Sequoia)+

16. INSTALL INTAKE MANIFOLD

(a) Install the intake manifold 3UR-FE INTAKE / EXHAUST: INTAKE MANIFOLD: INSTALLATION (2008 Sequoia) .

17. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY

(a) Install the exhaust manifold 3UR-FE INTAKE / EXHAUST: EXHAUST MANIFOLD: INSTALLATION (2008 Sequoia) .