|
Last Modified: 11-29-2007 |
1.6 A |
|
Service Category: Engine/Hybrid System |
Section: Emission Control |
|
Model Year: 2008 |
Model: Sequoia |
Doc ID: RM0000030WE005X |
|
Title: 3UR-FE EMISSION CONTROL: AIR SWITCHING VALVE: INSTALLATION (2008 Sequoia) |
INSTALLATION
1. INSTALL NO. 3 AIR TUBE
|
(a) Install a new gasket and the No. 3 air tube with the 2 bolts.
Torque: 10 N·m (102 kgf·cm, 7 ft·lbf)
NOTICE:
Make sure that the gasket's claws are not caught between the air tube and electric air control valve assembly.
HINT:
The identification color on the flange is orange.
|
2. INSTALL NO. 2 AIR TUBE
|
(a) Install a new gasket and the No. 2 air tube with the 2 bolts.
Torque: 10 N·m (102 kgf·cm, 7 ft·lbf)
NOTICE:
Make sure that the gasket's claws are not caught between the air tube and electric air control valve assembly.
HINT:
The identification color on the flange is blue.
|
3. INSTALL ELECTRIC AIR CONTROL VALVE ASSEMBLY
|
(a) Install the electric air control valve assembly with the 3 bolts.
Torque: 21 N·m (214 kgf·cm, 16 ft·lbf)
|
(b) Connect the 2 electric air control valve connectors.
|
(c) Install the bracket with the bolt.
Torque: 8.0 N·m (82 kgf·cm, 71 in·lbf)
|
(d) Connect the knock sensor's connector.
4. INSTALL AIR PIPE SUB-ASSEMBLY
(a) Connect the 2 No. 1 air hoses to the air pipe.
|
(b) Connect the air pipe to the electric air control valve assembly, and install the air pipe with the 2 bolts.
Torque: 10 N·m (102 kgf·cm, 7 ft·lbf)
|
|
(c) Connect the air pump connector clamp holder.
|
(d) Attach the wire harness claw.
(e) Connect the electric air control valve connector.
(f) Connect the No. 2 air injection system hose and No. 3 air injection system hose.
5. INSTALL FRONT WATER BY-PASS JOINT
|
(a) Install 2 new gaskets and the front water by-pass joint with the 4 nuts.
Torque: 21 N·m (214 kgf·cm, 16 ft·lbf)
|
(b) Connect the engine coolant temperature sensor connector.
6. CONNECT WATER BY-PASS PIPE HOSE (w/ Trailer Towing System)
|
(a) Connect the water by-pass pipe hose with the 3 bolts.
Torque: 10 N·m (102 kgf·cm, 7 ft·lbf)
|
7. CONNECT NO. 2 WATER BY-PASS HOSE
|
(a) Connect the No. 2 water by-pass hose to the water by-pass joint.
|
8. CONNECT NO. 1 WATER BY-PASS HOSE
(a) Connect the No. 1 water by-pass hose to the water by-pass joint and water inlet housing.
9. INSTALL NO. 1 ENGINE COVER
NOTICE:
Make sure that the No. 1 engine cover is level with the top surface of the intake port of the cylinder head for 1 and 2.
(a) Install the No. 1 engine cover.
HINT:
-
Align the No. 1 engine cover cutouts with the air tube.
-
Align the No. 1 engine cover with the air switching valve surface and cylinder head wall.
10. CONNECT FUEL TUBE CLAMP
|
(a) Connect the fuel tube clamp to the bracket.
|
11. INSTALL NO. 2 CYLINDER HEAD COVER
NOTICE:
Make sure that the No. 2 cylinder head cover is level with the top surface of the intake port of the cylinder head.
(a) Install the No. 2 cylinder head cover.
HINT:
-
Align the No. 2 cylinder head cover cutout with the air tube.
-
Align the No. 2 cylinder head cover with the front water by-pass joint and cylinder head wall.
12. INSTALL FAN SHROUD (w/ Trailer Towing System)
13. INSTALL FAN SHROUD (w/o Trailer Towing System)
14. INSTALL OUTLET RADIATOR HOSE
15. INSTALL INLET RADIATOR HOSE
16. INSTALL INTAKE MANIFOLD
(a) Install the intake manifold
.
17. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY
(a) Install the exhaust manifold
.
|